Stay ahead with the latest maritime insights — straight to your inbox with the MIS Newsletter.

Jumbo Offshore completes Argentina oil terminal work

LinkedIn
Email
Jumbo Offshore completes Argentina oil terminal work
Jumbo Offshore has completed its heavy-lift transport and offshore installation work for Argentina’s Vaca Muerta Oil Sur (VMOS) project, supporting the development of a new crude oil export terminal near Punta Colorada.

The marine terminal, located approximately 5–8 km offshore, will connect to Argentina’s Vaca Muerta shale formation through a 437 km pipeline.

Once operational, it will enable crude oil exports to Very Large Crude Carriers (VLCCs), with an initial capacity of up to 550,000 barrels per day and the potential to increase to 700,000 barrels per day.

Altius S.A. contracted Jumbo Offshore to transport and install two Catenary Anchor Leg Mooring (CALM) buoys, each weighing approximately 340 tonnes, and two Pipeline End Manifolds (PLEMs), weighing up to 232 tonnes each. The project was secured with local support from the JSI Alliance.

The operation began in Muscat, Oman, where Jumbo deployed its DP2 heavy-lift vessel, Jumbo Javelin, to load the equipment through a double-banking, ship-to-ship lifting operation.

Following loading and seafastening, the vessel sailed to Argentina via the Cape of Good Hope.

Upon arrival, Jumbo Javelin used its dynamic positioning (DP) capabilities to install both PLEMs at approximately 40 metres water depth. The vessel also completed the discharge of both CALM buoys.

READ: PIL orders seven 1,400-TEU vessels in China

Freek Muurling, Project Manager, Jumbo Offshore, said: “This project demonstrates Jumbo Offshore’s integrated heavy-lift transport and offshore installation capabilities, supporting the development of important energy infrastructure around the world. I’m proud of what our team has accomplished throughout this challenging campaign.

“From the ship-to-ship loading operation in Muscat and the safe transport of the CALM buoys and PLEMs, to the successful offshore installation of both PLEMs and discharge of the buoys in Argentina, it has been a tremendous team effort. My thanks go to everyone involved, both onboard and ashore, and to our project partners for their flexibility, support and cooperation throughout the campaign.”


Find more information:

Jumbo Offshore – https://www.jumbomaritime.nl/

Weekly Email Newsletter

Sign up to our weekly email newsletter to receive the latest news from Maritime Information Services.
FREE

Partner With Us

Get seen by the right audience and turn visibility into valuable leads.

Webinar Series

Launch your next webinar with us and connect like never before.

Latest Stories

Cookie Policy. This website uses cookies to ensure you get the best experience on our website.